Waste Treatment Works.
£750,000.00
OCL Contract Value
PROJECT DETAILS:
The FRC contract began in 2019 with works to the new water screening route, bases and 4m high walls host a precast floor system that hold powerfloated concrete slabs. Overhall have also completed the foundations and base slab for a gas bag holder, this included large slabs, in-situ concrete columns and a suspended powerfloat-finished slab.