Works to existing glass factory.

  • Havercroft
  • Knottingley
£500,000.00

OCL Contract Value

PROJECT DETAILS:

This project was split into two distinct phases, a large FRC pit within the working area of the factory and remediation of an older area of site. The FRC works involved the excavation, dewatering, and construction of a reinforced concrete pit to a depth of over 5m within the live factory site. Overhall were heavily involved, at pre-construction phase, with the design of the pit and the temporary works system to ensure programme and cost savings to the client. The remediation works involved demolition, removal of redundant footings and surfacing to a disused area of the site, crushing the excavated material and re-using on site as a hardstanding so the area could be utilised for future development.

North Yorkshire Highways Framework

North Yorkshire

Jocks Lodge

A164 & Jocks Lodge Junction Improvement Scheme

CDC Unit, Scunthorpe

North Lincolnshire and Goole Trust (NHS)

Scartho Top Development

Countryside Partnerships

Bus Interchange Renovation and Resurfacing

South Yorkshire Mayoral Combined Authority

Buckingham Group

Project Green, Wren Kitchens

CONTACT.

Telephone: 01724 720361
Fax: 01724 720039
info@overhall.org

 

AGGREGATES.

Telephone: 01724 720361
aggregates@overhall.org

ADDRESS.

16 Carr Lane
Thealby
Scunthorpe
North Lincolnshire
DN15 9AE

SOCIAL MEDIA.

Instagram
Facebook

© Copyright 2019 Overhall Ltd | All Rights Reserved - Enfold WordPress Theme by Kriesi
  • Services
  • Projects
  • News
  • Join the team
  • Health and Safety
  • Contact
Scroll to top