Dry Dock Amphitheatre.
£250,000.00
OCL Contract Value
PROJECT DETAILS:
The regeneration of the old dry dock into an outdoor performance space and several office buildings took place in 2016. Overhall’s works included foundations, reinforcement bar, drainage, services, block paving and kerbing as well as the formation of the bases of the amphitheatre structure which were located at the bottom of the dry dock.