Brighouse – Extra Care Facility .
£1,000,000.00
OCL Contract Value
OCL Contract Value
Construction of the 65 bed Care facility on the very steep and very tight site began in 2018 and has consisted of an earthworks package and large foundation and retaining wall structures that have formed an FRC package containing walls of 6m+ in height. Overhall have also completed the beam and block flooring, drainage, temporary propping and external works.